Commercial Trust-T-Lift Installation Instructions
Next Page (2 of 8)
The Commercial Trust-T-Lift is pre-assembled and tested in the factory before shipping. The lift is then disassembled into the components shown in Figure 1. All fasteners required to assemble the lift are re-installed in their respective positions after disassembly, except for the Lower Mechanical Stops (5/8" X 3" Carriage Bolts) included with the small parts bag.
Assembly of the Commercial unit is as follows:  

Straight or Adjacent Access Unit

  • Carefully unpackage the Commercial Trust-T-Lift components, confirm the following parts as shown in Fig. 1 are included:
  o Trust-T-Lift Tower Part A
o Carriage with Toe Plate Part B
o Base Frame Part C
o Solid Handrail Part D
o Control Wall Extension Part E
o Carriage Gate Part F
o Upper Gate Part G
o Lower Remote Call Station Part H
o Tower Mounting Angle Part I
FIG. 1- PARTS INCLUDED WITH A STRAIGHT COMMERCIAL UNIT Adjacent Unit will also include a corner post (not shown)



FIG. 2- PLUGGING IN UNDER DECK SAFETY LIMITS
  • Install the base frame, tower and carriage according to the Trust-T-Lift Installation Manual Pages 1-1 to 2-3, in order to operate the lift without field wiring completed, use a 12" insulated jumper wire and bypass from #1 to #5 for down movement and from #1 to #2 for up movement. Use extreme caution when running the unit down as the lower limit switch is bypassed and the drive nuts could possibly run out of the guide channel
  • Plug the Under Deck Safety Limits into the Inside Junction Box as shown in Fig. 2.
  • From this point forward in order to run the unit without the field wiring completed, only bypass #1 to #2 on the terminal strip (do not hardwire the jumper wire in place, only bypass when movement is required)